Temperature control units of the HK series type 15-9D and 1502D
For consumers with several cavities, thermobiehl Apparatebau GmbH has developed a temperature control unit with a special gear pump. Thanks to the pump design, two temperature control circuits can be supplied simultaneously with uniform temperature control. The volume flow remains constant at both pump outputs. It is thus ensured that each cavity is tempered with the same conditions.
Equipment
- Space-saving design
- High cooling performance
- Leakage free drive unit
- Dry-run protection
- Leak stop up to 350 °C
- Interface RS 485
- Safety temperature limiter
- Signal input / output
- Bypass
- Leak monitoring (hobby, toppy, woodpecker)
- Flow sensor, return sensor, tool sensor
- all as standard
- Descaling function
- Control channel, selectable
- Weekly timer
- Flow monitoring
- Operating hours counter
- Self-optimising control system
- Level monitoring
- Energy-saving feature
- Overheating protection
- TÜV certified
- Working hours counter
Technical Data
- Temperature regulation circuits: 1 (type 15-9D) / 2 (type 1502D)
- Control system: TF 2000
- Max. flow temperature: 250 °C / 350 °C
- Cold oil overlay in the equalization tank: 3 l
- Circulating oil: 8 l - 11 l (type 15-9D) / 13 l - 19 l (type 1502D)
- Heating capacity at 400V per circuit: 12 / 18 / 24 kW
- Cooling capacity per circuit: 65 kW (type 15-9D) / 65 kW (type 1502D)
- Max. flow rate of the peripheral pump per circuit: 2x16 l/min
- Power consumption of the pump per circuit: 0,45 kW
- Max. pump pressure: 8 bar
- Measuring type Fe-CuNi: Forward, Return, External
- Supply voltage: 400 V 50 Hz 3 PE
- Connection to system circuit: 1/2“
- Connection to water circulation: 1/2“
- Dimensions: B 370 mm H 850 mm T 1070 mm (type 15-9D) / B 370 mm H 1065 mm T 1070 mm (type 1502D)
- Weight: 100 kg (type 15-9D) / 170 kg (type 1502D)
Optional equipment
- Profibus
- Profinet
- Control system „hobby“
- Flow measurement
- Cooling water outlet cooling
- Overfill protection
- Cabinet cooling
- Automatic cooler evacuation